Location of performance / Site: | Bahnhofstraße 28, Neunburg vorm Wald, Bavaria, Germany, Europe |
---|---|
Period: | Apr - Jul 2022 |
Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Edelshausen, Schrobenhausen |
Dismantling of a former petrol station and a milking technology building
Excavation and disposal of contaminated soils
Temporary storage of polluted soils
Expansion and disposal of underground tanks
Installation of a mobile groundwater purification plant
Dismantling amount: | Complete dismantling |
---|---|
Dismantling process: | Selective dismantling |
Type of building: | Commercial buildings |
Building volume: | 2500 |
Safety precautions: | Personal protective equipment (PPE), PID measurements, Black and white facility |
---|
Safety precautions: | Black and white facility |
---|
Pollutants: | Gasoline, diesel, heating oil (TPH) |
---|
Construction and demolition waste: | Asbestos-containing building materials (17.06.05), Construction and demolition waste without hazardous substances, Gypsum-based building materials without hazardous substances, Soil and stones without dangerous substances, Soil and stones containing dangerous substances, Insulating material containing dangerous substances, Wood (17.02.01), Wood, glass, plastics containing dangerous substances, other construction and demolition wastes containing dangerous substances |
---|---|
Transport: | Saddle, Saddle planned, Big bags on truck saddle |
Tonnage: | 150 to |
Soil treatment: | Breaking / Sieving, Landfill |
Loading category: | DK I |
Treatment methods: | Activated carbon filtration |
---|---|
Volume flow: | 5 m³/h |