Location of performance / Site: | Am Bruchhübel, Bad Dürkheim, Rhineland-Palatinate, Germany, Europe |
---|---|
Period: | Apr - Sep 2008 |
Responsible company location: | Schrobenhausen (Headquarters) |
Project Partners: |
---|
Result: | Landfill Cover |
---|
Deporting the existing sward
Loosening of the existing subsurface (30 cm)
Application of the water storage layer (1.70 m) and infiltration layer (0.30 m)
Surface driving with a tracked vehicle with a surface pressure of less than 1.5 t/m²
Installation quality “no compression” (no driving, no construction with standard machines, no intermediate storage)
high performance required: 100,000 m³ in 16 weeks
severe weather dependencies
Surface sealing: | Excavation-damaged zone, Water balance layer, Water storage layer |
---|---|
Surface sealing area: | 44000 m² |
Installation materials cubature: | 88000 |
"Written confirmation"