Dismantling of the aboveground and underground tank farm installations including all necessary services, sheeting, disposal and dewatering:
- - Demolition of the pump house
- - Tank cleaning
- - Removal of 5 x 100 m³ fuel tanks
- - Remove buoyancy protection 24 m³
- - Surveying work, with drone flights
- - Removal of line ducts 150 m
- - Partial excavation lining
- - Excavated soil, approx. 1,500 m³, of which 460 m³ contaminated with MKW/PAH
- - backfilling
- - Disposal
- - Dewatering with water purification
- Special features/technical data
- - Materials containing asbestos, materials containing tar
- - Black and white plant
- - Dewatering with 7 wells, each 8.5 m deep and 300 mm in diameter.
- - Pumping of water up to 140 m³/h