Location of performance / Site: | Thomas-Wimmer-Ring, München, Bavaria, Germany, Europe |
---|---|
Period: | Apr 2017 - Jul 2020 |
Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Edelshausen, Schrobenhausen |
Equipment earthwork: | Excavator, Wheel loaders, Bulldozers, Backhoe excavator |
---|---|
Earthworks: | Excavation, Road bed excavation, Building pit, Planum |
Excavation method: | Conventional with loader and excavator, Excavation in shoring boxes, Untertageaushub |
Earthwork mass: | 90000 cbm |
Tonnage: | 180000 |
Excavation depth & GOK: | 14 |
Filling materials: | Gravel |
Applications earthwork: | Excavations, Tunneling |
Pollutants: | Gasoline, diesel, heating oil (TPH), Organic pollution as TOC, PAH |
---|
Construction and demolition waste: | Dredged material without dangerous substances, Concrete (17.01.01), Soil and stones without dangerous substances, Tiles, bricks and ceramics (17.01.03), Soil and rocks under AVV 170504 |
---|---|
Transport: | Saddle, Saddle planned |
Tonnage: | 30000 to |
Disposal: | Provision for disposal, Recycling - installation, Landfill |
Soil treatment: | Biological soil treatment, Conditioning |
Loading category: | Z0 LAGA Soil, Z 1.1 LAGA Soil, Z 1.2 LAGA Soil, Z 2 LAGA Soil, DK 0, DK I, DK II, RW 2 |
Dismantling amount: | Complete dismantling |
---|---|
Dismantling process: | Selective dismantling |
Type of building: | Unterführung |
Building volume: | 4000 |
Amount demolition materials: | 4000 |