Location of performance / Site: | Friedenstraße 22B, München, Bavaria, Germany, Europe |
---|---|
Period: | May 2019 - May 2021 |
Responsible company location: | Schrobenhausen (Headquarters) |
Project Partners: |
---|
Demolition, soil remediation, earthwork and sheeting work
Equipment earthwork: | Excavator, Wheel loaders, Backhoe excavator, Rolls |
---|---|
Earthworks: | Excavation, Road bed excavation, Building pit, Utility trench |
Excavation method: | Conventional with loader and excavator |
Earthwork mass: | 130000 cbm |
Tonnage: | 260000 |
Excavation depth & GOK: | 9 |
Filling materials: | Gravel |
Applications earthwork: | Excavations, Soil remediation |
Soil type road construction: | Gravels |
---|
Fields of application shoring work: | Civil engineering |
---|---|
Areas of application shoring work: | Soil replacement, Mine temporary support system |
Types of shoring earthworks: | Sheet pile wall, HDI wall, Mixed-in-place wall, Carrier board wall |
Shoring area: | 4500 m² |
Respiratory protection: | Particle filter |
---|---|
Safety precautions: | Personal protective equipment (PPE), PID measurements, Black and white facility, Enclosure with negative pressure |
Safety precautions: | Suction, Enclosure with negative pressure, Black and white facility, Boot washer |
---|---|
Volume flow extraction enclosure: | 500 |
Construction and demolition waste: | Asbestos-containing building materials (17.06.05), Construction and demolition waste without hazardous substances, Gypsum-based building materials containing hazardous substances, Concrete (17.01.01), Bitumen mixtures not tarry (17.03.02), Soil and stones without dangerous substances, Soil and stones containing dangerous substances, Insulation material without dangerous substances, Insulating material containing asbestos, Insulating material containing dangerous substances, Tiles, bricks and ceramics (17.01.03), Track ballast without dangerous substances, Wood (17.02.01), Wood, glass, plastics containing dangerous substances, Coal tar and tarry products (17.03.03), Coal tar-containing bituminous mixtures (17.03.01), Soil and rocks under AVV 170504, other construction and demolition wastes containing dangerous substances |
---|---|
Transport: | Capped containers, Saddle, Saddle planned, Big bags on truck saddle, Truck |
Tonnage: | 150000 to |
Disposal: | Provision for disposal, Recycling - installation, Landfill |
Soil treatment: | Biological soil treatment, Conditioning, Separating, Sieving, Landfill: Monolandfill |
Loading category: | Z 1.1 LAGA Soil, Z 1.2 LAGA Soil, Z 2 LAGA Soil, > Z 2 LAGA Soil, DK 0, DK I, DK II, DK III, > DK III |
Type of remediation: | Pollutant remediation |
---|---|
Indoor pollution: | Asbestos / asbestos cement, KMF, PAK |
Applications and objects: | Office building, Commercial building, Industrial building |
Building sector: | Roof, Basement, cellar, Outer facade |
Building examinations: | Ambient air analytics, Clearance measurement |
Dismantling amount: | Complete dismantling |
---|---|
Dismantling process: | Dismantle, Selective dismantling, Filling |
Type of building: | Office buildings, Commercial buildings, Industrial buildings, Skyscrapers |