Location of performance / Site: | Brunn 3, Geisenfeld, Bavaria, Germany, Europe |
---|---|
Period: | 2017 |
Responsible company location: | Schrobenhausen (Headquarters) |
The exploited sections of the Brunn pit will be converted into a class 0 inert waste landfill by installing the necessary sealing, seepage water collection and cleaning systems. The landfill is filled exclusively with mineral waste, the pollution of which complies with the limit values for landfill class 0.
The expansion and backfilling will take place in 8 stages in the period from 2017 to probably 2030.
Approved waste code:
10 11 03 - glass fiber waste (only without organic binders)
10 12 08 - waste ceramics, bricks, tiles and stoneware (after firing)
15 01 07 - packaging made of glass (with the exception of packaging of the dual system)
17 01 01 - concrete
17 01 02 - brick
17 01 03 - tiles and ceramics
17 01 07 - Mixtures of concrete, bricks, tiles and ceramics other than those mentioned in 17 01 06
17 02 02 - glass
17 05 04 - soil and stones other than those mentioned in 17 05 03
17 05 06 - dredged spoil other than those mentioned in 17 05 05
19 12 05 - glass
20 01 02 - glass
20 02 02 - soil and stones
Landfill category: | DK 0 |
---|---|
Cubature landfill body: | 600000 |